Flexible Solutions for EveryConstruction Timeline
Choose the delivery model that fits your project needs. Fast delivery from USA stock or maximum savings with factory direct.
Quick Decision Guide
Choose Pre-Fab USA Stock if you need:
- Delivery in less than 8 weeks
- Model units or showrooms ASAP
- Small quantity orders (under 50 units)
- Standard specifications that work
- To avoid production delays
Choose Factory Direct if you have:
- 90+ days until installation
- Large scale projects (50+ units)
- Specific design requirements
- Budget optimization as priority
- Flexibility in project timeline
Detailed Model Comparison
Everything you need to know to make the right choice for your project
Project Timeline Comparison
Visualize how each model fits your construction schedule
Pre-Fab USA Stock Timeline
Day 1
Order Placed
Day 2-3
Order Processing
Week 1-2
Preparation
Week 2-8
Delivery
Factory Direct Timeline
Week 1
Design & Quote
Week 2-3
Approval & Deposit
Week 4-14
Manufacturing
Week 15-16
QC & Shipping
Week 17-18
Delivery
Interactive Cost Analysis
See real-time savings based on your project size
Typical Retail Price
$250,000
Baseline for comparison
Quick Ship Price
$205,000
Save $45,000 (18%)
Factory Direct Price
$150,000
Save $100,000 (40%)
ROI Insight
With 100 units, Factory Direct could save you an additional $55,000 compared to Quick Ship. That's enough to upgrade finishes or add amenities!
Complete Interior Solutions
Everything you need for multi-family interiors, available in both delivery models
Kitchen Cabinets
Full range of styles from shaker to modern flat-panel
- Soft-close standard
- 15+ finishes
- ADA compliant options
Bathroom Vanities
Single and double configurations for every unit type
- Water-resistant construction
- Integrated tops available
- Wall-mounted options
Countertops
Quartz, granite, and solid surface options
- Prefabricated sizes
- Custom edge profiles
- Integrated sinks
Sinks & Fixtures
Commercial-grade stainless and composite options
- NSF certified
- ADA compliant
- Lifetime warranty available
Which Model Fits Your Project?
Answer 3 quick questions to get our recommendation
✓ Choose Pre-Fab USA Stock When:
- You need units delivered within 8 weeks
- Building model units or starting Phase 1
- Quick ROI through faster lease-up is priority
- Standard specifications meet your needs
✓ Choose Factory Direct When:
- You have 90+ days before installation
- Maximum cost savings is the priority
- Ordering for 50+ units at once
- Need specific colors, sizes, or features
Ready to Optimize Your Next Project?
Our team will help you choose the perfect delivery model and create a custom solution for your needs.